NS H76 Editors Pick! Contributor's Pick!       
Two EMD's and a high and wide load on H76 at 12:03PM. Although it's tough to tell in this photo, in less than a half hour the entire sky would be covered in dark clouds.
Date: 2/10/2008 Location: Steel City, PA Views: 885 Collection Of:   Austin MacDougall
Locomotives: NS 5115(GP38-2) NS 3430(SD40-2)    Author:  Austin MacDougall
NS H76
Picture Categories: Action This picture is part of album:  NS Harrisburg Div. January-March 2008
Share
User Comments
Name Type Comments Date
George Redmond General Very nice shot. 2/28/2008 10:10:16 PM
Jacob Nelson General What are they hauling, and why do they need two loco's? 3/1/2008 7:28:11 PM
Robert Garton General What a weird train... 3/2/2008 3:26:42 PM
Jim Gavin General The reason for the 2 engines is that NS cut the crew from 4 to 2 men, so you can't make a drop of the car to get it on the other end of the engine. The engineer has to change engines depending on which way the switch faces that the car is being placed in. 3/8/2008 1:02:15 PM
J. Williams General Nce catch. 4/4/2008 4:08:35 PM
William H. Davis Jr. General Great shot 4/23/2008 4:17:22 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1046249