A few years back a general contractor rebuilt the crossing into the Ellsworth High School. The track approaches to the Xing were rebuilt in the process. The rail used in these approaches was of a different profile then the 85 lb rail used by the MEC. This rail just taken from the old siding will replace that rail and deaden the 1/8+ inch CLICK/CLACK to something the passengers will hardly notice. |
Date:
7/25/2009 |
Location:
Ellsworth, ME Map ![Show Ellsworth on a rail map](/images/map_us.gif) |
Views:
132 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
|
Author: David Larrabee
|
![Unloading Rail at H.S.Crossing](http://s3.amazonaws.com/rrpa_photos/49064/2009%20Summer%20DSRX%20Work%20034.JPG) |
Picture Categories: RollingStock,Yard,Track,Action |
This picture is part of album: Working on the Downeast Scenic RR |