3 Power Switch being removed at ALTO.         
Matinence of Way crews are seen here removing a section of the ALTO controlled 3 Power switch. It was replaced with a hand thrown switch.
Date: 5/2/2012 Location: Altoona (CP ALTO), PA Views: 108 Collection Of:   Dustin Faust
Author:  Dustin Faust
3 Power Switch being removed at ALTO.
Picture Categories: Action This picture is part of album:  Alto Tower / Downtown Altoona Pictures
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3027673