The MOW crew sets up the equipment before 915 starts to shove back and drop new rail         
Date: 4/4/2012 Location: Boone-Watkins Sdg, VA Views: 248 Collection Of:   Jon Hall
Locomotives: NS 3445(SD40-2) NS 3442(SD40-2)    Author:  Jon Hall
The MOW crew sets up the equipment before 915 starts to shove back and drop new rail
Picture Categories: This picture is part of album:  
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3094196