With BNSF C44-9W 4134 behind, CSX SD60I 8735 and ES40DC 5426 are ready to roll out of the engine staging area with a double stacker at the Fairburn Intermodal Facility on November 30, 2015. |
Date:
11/30/2015 |
Location:
Fairburn, GA Map  |
Views:
148 |
Collection Of:

Alan Page |
Locomotives: |
Author: Alan Page
|
 |
Picture Categories: Yard,Action |
This picture is part of album: Late Nov, early Dec 2015 CSX Intermodal operations at Fairburn, GA |